Update Announcement
Please note that the proposed maximum volume taken per day is updated to 1,015,000 litres.
Cette consultation a eu lieu :
du 4 juillet 2024
au 3 août 2024
Résumé de la proposition
This proposal is for a renewal to Permit to Take Water No. 6751-9GXS8U for Brant Valley Golf Club Limited. Water will be taken from one watercourse for golf course irrigation purposes at the Brant Valley Golf Club, located in the City of Brantford, County of Brant, Ontario.
Détails de l'emplacement
Adresse du site
128 Governor's Road
Brantford,
ON
Canada
Détails de l'emplacement du site
Part of Lot 43 and 44, Concession 1
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
Brant Valley Golf Club Limited
400 Golf Course Road
Conestogo,
ON
N0B 1N0
Canada
Détails de la proposition
This proposal is for a renewal to Permit to Take Water No. 6751-9GXS8U for Brant Valley Golf Club Limited. Water will be taken from one watercourse for golf course irrigation purposes at the Brant Valley Golf Club, located in the City of Brantford, County of Brant, Ontario. Details of the water taking are as follows:
Permit type – renewal
Source Name: Fairchild Creek
- purpose: golf course irrigation
- maximum rate per minute (litres): 1,409
- maximum number of hours of taking per day: 12
- maximum volume per day (litres): 1,015,000
- maximum number of days of taking per year: 184
- earliest calendar date of taking (mm/dd): 04/01
- latest calendar date of taking (mm/dd): 10/31
- period of taking: 10 years
There are 3 categories of a Permit to Take Water:
- Category 1: water takings are anticipated to have a lower risk of causing an unacceptable environmental impact/interference
- Category 2: water takings are anticipated to having a higher potential of causing unacceptable environmental impact or interference
- Category 3: water takings are anticipated to have the highest potential of causing unacceptable environmental impactor interference
The proposed water taking qualifies as a Category 1 permit.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Communiquer avec nous
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Commentaire
La consultation est maintenant terminée.
La période de consultation a eu lieu du 4 juillet 2024
au 3 août 2024