Le présent avis porte sur une décision qui n’était pas assujettie au processus de consultation normal. Pour en savoir davantage sur le processus de consultation et les types d’avis publiés sur le registre.
Détails de l'emplacement
Adresse du site
1350 Government Rd West
Kirkland Lake,
ON
P2N 3J1
Canada
Détails de l'emplacement du site
Mecassa Mine
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowDétails de la proposition
Kirkland Lake Gold Inc.
1350 Government Road West
Kirkland Lake,
ON
P2N 3J1
Canada
Pourquoi une consultation n’est pas nécessaire
Requirements for public notification on the Environmental Bill of Rights registry do not apply where, in the minister’s opinion, the delay involved in giving notice to the public, in allowing time for public response to the notice, or in considering the response to the notice would result in:
- danger to the health or safety of any person;
- harm or serious risk of harm to the environment; or
- injury or damage or serious risk of injury or damage to any person.
An emergency Director's direction was issued as it was determined that a delay could result in harm or serious risk of harm to the environment.
The following factors were considered in making that determination:
- The company indicated to the ministry that they needed to lower the water level in their Conditioning Pond to provide adequate storage until the discharge period restarted April 1, 2019, and that the discharge was necessary to mitigate risk to the environment from a bypass and/or dam breach should the water level not be lowered. A delay in lowering the pond would create an overflow condition and could lead to a catastrophic dam failure thereby resulting in the discharge of untreated water which would be harmful to the environment
Détails de l'exception
The Director provided emergency authorization to the company to operate the Effluent Treatment Plant located at their Macassa Mine for a period beyond the seasonal window of April 1st to November 30th as required by Environmental Compliance Approval (ECA) No.6702-B64JKA.
In their request, the company indicated to the ministry that they needed to lower the water level in their Conditioning Pond to provide increased storage until the discharge period restarted April 1, 2019 and that the discharge was necessary to mitigate risks to the environment from a bypass and/or dam breach should the water level not be lowered.
With the exception of the extended discharge period, the issued direction also required the company to follow all conditions stated in the related Environmental Compliance Approval as well as to develop and follow a discharge plan, and to monitor and report on all activities related to the provided Direction.
Once issued, the company was able to lower the water level to the extent they felt was needed.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
5520 Hwy 101 E
PO Bag 3080
South Porcupine,
ON
P0N 1H0
Canada
Communiquer avec nous
Personne-ressource
George Lajeunesse
5520 Hwy 101 E
PO Bag 3080
South Porcupine,
ON
P0N 1H0
Canada