Cette consultation a eu lieu :
du 26 juin 2024
au 10 août 2024
Résumé de la proposition
This proposal is for an amendment to the Environmental Compliance Approval No. 3-0246-80-006 from Dockside Marine Inc. for the proposed sewage works expansion and upgrade serving Northern Harbour Marina located at 361 Northern Harbour Road in the Township of Kirkup, Ontario.
Détails de l'emplacement
Adresse du site
361 Northern Harbour Road
Kirkup,
ON
Canada
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
Dockside Marine Inc.
361 Northern Harbour Road
Kirkup,
ON
P9N 3X8
Canada
Détails de la proposition
This proposal from Dockside Marine Inc. is for an amendment to Environmental Compliance Approval No. 3-0246-80-006 for the proposed sewage works expansion and upgrade serving Northern Harbour Marina that consists of existing 229 docking slips, proposed 372 additional docking slips, comfort stations (washroom and shower facilities), fuel supply, mechanical/repairment service, and boat storage facilities, located at 361 Northern Harbour Road, Township of Kirkup, Ontario.
After the proposed expansion and upgrade, the current sewage works includes a 22,600-litre sewage pump out tank at the dock, a 8580-litre sewage lift station at the dock that pumps to the 13,000-litre sewage lift station (equipped with overflow alarms and a back-up pump system) that transfers all effluent to the sewage treatment lagoon. There are 2 sewage holding tanks on site (at the owner’s residence and at the shop that are pumped out regularly by a licensed sewage hauler (there are no septic tanks/fields on site)).
At present a single cell existing lagoon with a proposed slight height increase thus increasing surface area to 2,063 square metres with an maximum effluent depth of 2.50 meters and resultant capacity of 5157 cubic metres plus a new lagoon cell with a capacity of 3,227 cubic metres and a water depth of 2.50 metres, as well as a pump-out chamber and pipelines for discharge effluent for spray irrigation in a significantly large woodland with a much larger expanse than the required total area of spray circles of 12,720 square meters or 1.3 hectares, that located immediately to the north and west of the present single cell lagoon. (This area has been used for the spray irrigation of the present lagoon for the past 44 years and has ample room for the additional treated effluent to be sprayed).
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
135 St. Clair Avenue West
Floor 1
Toronto,
ON
M4V 1P5
Canada
Communiquer avec nous
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Commentaire
La consultation est maintenant terminée.
La période de consultation a eu lieu du 26 juin 2024
au 10 août 2024