Cette consultation a eu lieu :
du 30 novembre 2018
au 14 janvier 2019
Résumé de la décision
A new Environmental Compliance Approval (Industrial Sewage) was issued to install an Ultraviolet (UV) system as a physical tool to control the infestation of zebra/ quagga mussels in the service water system of the Ranney Falls Hydroelectric Generating Station.
Détails de l'emplacement
Adresse du site
18 Trent Drive
Trent Hills
Campbellford,
ON
K0L 1L0
Canada
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
Ontario Power Generation Inc.
8 Trent Drive
Rural Route Delivery 1
Campbellford,
ON
K0L 1L0
Canada
Détails de la décision
Decision on instrument
A new Environmental Compliance Approval (Industrial Sewage) was issued to install an Ultraviolet (UV) system as a physical tool to control the infestation of zebra/ quagga mussels in the service water system of the Ranney Falls Hydroelectric Generating Station, located at 18A Trent Drive, in the Community of Campbellford, in the Municipality of Trent Hills, Northumberland County.
It discharges into the Trent River, within the Bay of Quinte Watershed. The Disinfection Ultraviolet Light System is designed to provide Ranney Falls Generating Station a chemical-free control of invasive mussels, with the benefits of macro/ micro biofouling control and reduce the need for mechanical cleaning of the pipe.
The attached document is intended for posting on the Environmental Registry in order to provide the reader with the substantive content of the issued instrument. Please note the official version may be differently formatted or otherwise contain minor variations from this version.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
135 St. Clair Avenue West
1st floor
Toronto,
ON
M4V 1P5
Canada
300 Water Street
Floor 2, Robinson Place South Tower
Peterborough,
ON
K9J 3C7
Canada
How to Appeal
Cet avis de décision peut être porté en appel. Vous avez jusqu’à 15 jours à partir du 29 avril 2019 pour entamer le processus d’appel.
Veuillez lire les renseignements suivants attentivement pour en savoir plus sur le processus d’appel.
Comment interjeter appelClick to Expand Accordion
For instrument decisions published on or after June 1, 2021, please refer to the updated instructions for information on how to appeal a decision.
Appeal process for decisions published before June 1, 2021
If you’re an Ontario resident, you can start the process to appeal this instrument decision.
First, you’ll need to seek leave (i.e. get permission) from the relevant appellate body to appeal the decision.
If the appellate body grants leave, the appeal itself will follow.
Seek leave to appeal
To seek leave to appeal, you need to do these three things:
- prepare your application
- provide notice to the minister
- mail your application to three parties
1. Prepare your application
You’ll need to prepare an application. You may wish to include the following things in your application:
- A document that includes:
- your name, phone number, fax number (if any), and/or email address
- the ERO number and ministry reference number (located on this page)
- a statement about whether you are a resident in Ontario
- your interest in the decision, and any facts you want taken into account in deciding whether you have an interest in the decision
- the parts of the instrument that you’re challenging
- whether the decision could result in significant harm to the environment
- the reason(s) why you believe that no reasonable person – having regard to the relevant law and to any government policies developed to guide decisions of that kind – could have made the decision
- the grounds (facts) you’ll be using to appeal
- the outcome you’d like to see
- A copy of the instrument (approval, permit, order) that you you are seeking leave to appeal. You’ll find this in the decision notice on the Environmental Registry
- Copies of all supporting documents, facts and evidence that you’ll be using to appeal
What is considered
The appeal body will consider the following two questions in deciding whether to grant you leave to appeal:
- is there is good reason to believe that no reasonable person, with respect to the relevant law and to any government policies developed to guide decisions of that kind, could have made the decision?
- could the decision you wish to appeal result in significant harm to the environment?
2. Provide your notice
You’ll need to provide notice to the Minister of the Environment, Conservation and Parks that you’re seeking leave to appeal.
In your notice, please include a brief description of the:
- decision that you wish to appeal
- grounds for granting leave to appeal
You can provide notice by email at minister.mecp@ontario.ca or by mail at:
College Park 5th Floor, 777 Bay St.
Toronto, ON
M7A 2J3
3. Mail your application
You’ll need to mail your application that you prepared in step #1 to each of these three parties:
- appellate body
- issuing authority (the ministry official who issued the instrument)
- proponent (the company or individual to whom the instrument was issued)
Ontario Power Generation Inc.
8 Trent Drive
Rural Route Delivery 1
Campbellford,
ON
K0L 1L0
Canada
Environmental Review Tribunal
Attention: The Secretary
655 Bay Street
Floor 15
Toronto, Ontario
M5G 1E5
(416) 212-6349
(866) 448-2248
OLT.Registrar@ontario.ca
Inclure les éléments suivants:
Il ne s'agit pas d'un avis juridique. Veuillez vous reporter à la Charte des droits environnementaux de 1993 pour connaître les exigences exactes prévues par la loi. Consultez un avocat si vous avez besoin d'aide avec le processus d'appel.
Communiquer avec nous
Contact
Application Assessment Officer
Proposition initiale
Détails de la proposition
Description of instrument
This proposal is for a new Environmental Compliance Approval (Industrial Sewage) to install an Ultraviolet (UV) system as a physical tool to control the infestation of zebra/ quagga mussels in the service water system of the Ranney Falls Hydroelectric Generating Station, located at 18A Trent Drive; in the Community of Campbellford, in the Municipality of Trent Hills, Northumberland County.
The system discharges into the Trent River, within the Bay of Quinte Watershed.
The Hydro Optic Disinfection Ultraviolet Light System (HOD UV) will provide Ranney Falls Generating Station a chemical-free control of invasive mussels, with the benefits of macro/ micro biofouling control and reduce the need for mechanical cleaning of the pipe.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
135 St. Clair Avenue West
1st floor
Toronto,
ON
M4V 1P5
Canada
300 Water Street
Floor 2, Robinson Place South Tower
Peterborough,
ON
K9J 3C7
Canada
Commentaire
La consultation est maintenant terminée.
Cette consultation a eu lieu 30 novembre 2018
au 14 janvier 2019
Commentaires reçus
Par l'entremise du registre
0Par courriel
0Par la poste
0