Cette consultation a eu lieu :
du 1 mars 2018
au 31 mars 2018
Résumé de la décision
Permit Issued. The exploration permit is valid for 3 years from the date of issue.
Détails de l'emplacement
Détails de l'emplacement du site
To view individual claims on a map please use the Mining Lands Administration System. Click on “I want to…” and select “Find a claim” to search by claim numbers or "Find a township" to search by township.
Claim numbers: 4281377, 4281378, 4281379, 4281380
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
Michel Dorval
22 van Horne Crescent
Marathon,
ON
P0T 2E0
Canada
Effets de la consultation
No comments were received resulting in no impact on the decision whether or not to proceed with this proposal.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
435 James Street South
Suite B002
Thunder Bay,
ON
P7E 6S7
Canada
How to Appeal
Les appels ne sont pas autorisés
Ce type d’acte ne peut être porté en appel. En savoir plus sur notre processus de consultation.
Communiquer avec nous
Contact
Neal Bennett
435 James Street South
Suite B002
Thunder Bay,
ON
P7E 6E3
Canada
Proposition initiale
Détails de la proposition
Michel Dorval has submitted an application to MNDM as required under the Mining Act for prescribed early exploration activities. The project is situated approximately 15km NE of Terrace Bay, Ontario.
The activities that this permit would allow Michel Dorval to carry out are as follows:
- geophysical Surveys Requiring a Generator
- mechanized Stripping (<=100m2 in 200m radius)
- pitting and Trenching of Bedrock (>1m3, <=3m3 in 200m radius)
- line Cutting (<1.5m width)
- mechanized Drilling (assembled weight of drill <=150 kg)
An Exploration Permit does not relieve the proponent from compliance with any other requirements that are set out under the Mining Act or any other Act. Further all activities included in the Exploration Permit proposal must be carried out in compliance with O Reg. 308/12 and the Provincial Standards for Early Exploration.
The Exploration Permit duration will be up to 3 years with the possibility of one renewal for up to 3 years.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
435 James Street South
Suite B002
Thunder Bay,
ON
P7E 6S7
Canada
Commentaire
La consultation est maintenant terminée.
Cette consultation a eu lieu 1 mars 2018
au 31 mars 2018
Communiquer avec nous
Contact
Neal Bennett
435 James Street South
Suite B002
Thunder Bay,
ON
P7E 6E3
Canada
Commentaires reçus
Par l'entremise du registre
0Par courriel
0Par la poste
0