Instrument type:
Changes to the conditions of a licence to operate a pit or quarry
ERO number
013-4830
Notice type
Instrument
Notice stage
Decision
Decision posted
Proposal posted
Comment period
March 7, 2019 - April 22, 2019 (46 days) Closed
Last updated
The application made by O. Bettschen Construction Limited to amalgamate Licence #2409 and Licence #625121 as one operation, licensed under #2409 has been approved.
Instrument type:
Changes to the site plan for a pit or quarry
ERO number
013-4827
Notice type
Instrument
Notice stage
Decision
Decision posted
Proposal posted
Comment period
March 7, 2019 - April 22, 2019 (46 days) Closed
Last updated
The application for O. Bettschen Construction Limited for a major site plan amendment to change the final depth of extraction from above the water table (160 metres above sea level) to extraction below the water table to an elevation of 146 metres for two adjacent quarry sites has been approved.
Instrument type:
Changes to the site plan for a pit or quarry
ERO number
012-1695
Notice type
Instrument
Notice stage
Decision
Decision posted
Proposal posted
Comment period
April 28, 2014 - May 28, 2014 (30 days) Closed
Last updated
The application for a site plan amendment for Lafarge Canada Inc. operator of a Class A pit (Oro Pit – ARA licence #3553) with extraction occurring above the water table on a 165.64 hectare ARA licence has been approved.
Instrument type:
Changes to the site plan for a pit or quarry
ERO number
013-4218
Notice type
Instrument
Notice stage
Decision
Decision posted
Proposal posted
Comment period
December 6, 2018 - January 7, 2019 (32 days) Closed
Last updated
The application for Drain Bros. Excavating Limited for a major site plan amendment to reduce the excavation setback area along portions of the south extraction limit of Licence # 3350 (Havelock Quarry) has been approved.
Instrument type:
Changes to the site plan for a pit or quarry
ERO number
013-0055
Notice type
Instrument
Notice stage
Decision
Decision posted
Proposal posted
Comment period
March 16, 2017 - April 18, 2017 (33 days) Closed
Last updated
The application which E.S. Johnston Farms Ltd. submitted to amend their current site plan to revise the phasing of extraction on site, has been approved.
Instrument type:
Changes to the conditions of a licence to operate a pit or quarry
ERO number
013-4466
Notice type
Instrument
Notice stage
Decision
Decision posted
Proposal posted
Comment period
January 15, 2019 - December 2, 2019 (32 days) Closed
Last updated
Application has been grated to D’Arcey Sand & Gravel Ltd. to vary a condition their current licence to authorize an increase in the number of tonnes of aggregate to be removed in a calendar year.
February 22, 2019 - April 8, 2019 (45 days) Closed
Last updated
An Environmental Compliance Approval with Limited Operational Flexibility (Air & Noise) has been granted to Rosscomm Holdings Ltd., a hot-mix asphalt plant, located at 10 Freshway Drive, Vaughan, Ontario.
January 10, 2019 - February 24, 2019 (45 days) Closed
Last updated
An amendment to an Environmental Compliance Approval (Air & Noise) with Limited Operational Flexibility has been granted to CGC Inc., a manufacturer of gypsum wallboard located in Hagersville, Ontario.
January 10, 2019 - February 24, 2019 (45 days) Closed
Last updated
An Environmental Compliance Approval (Air & Noise) has been granted to Bentinck Packers Limited, a slaughter house located in the Town of Hanover, Ontario.
December 10, 2018 - January 24, 2019 (45 days) Closed
Last updated
A new Environmental Compliance Approval has been granted for the establishment of a Year Round subsurface sewage disposal works rated at 1,600 litre per day, to service a residence located at 580 Green Point Road, in the Municipality of Shuniah.
September 26, 2018 - October 27, 2018 (31 days) Closed
Last updated
A new Environmental Compliance Approval has been granted for the existing greenhouse stormwater management facility serving Andrew Hendriks & Sons Greenhouses Inc., located at 5095 North Service Road in the Town of Lincoln.
A new Environmental Compliance Approval has been granted for an existing greenhouse stormwater management facility serving Konkle Farm & Greenhouses Ltd., located at 228 Robinson Road, Lot 1 Concession 1 Dunnville, Haldimand County.
September 7, 2018 - October 22, 2018 (45 days) Closed
Last updated
Approval was granted for the establishment of stormwater management (SWM) works to service an existing gas station located at 448 Talbot Street West in Lemington, Ontario.