This notice was updated on February 29, 2024 to correct a minor error on the description of the address from 29841 to 29831 Irish School Road
This consultation was open from:
January 31, 2024
to March 16, 2024
Proposal summary
The application is for an amendment to Environmental Compliance Approval No. A020401 for a 0.8-hectare waste processing site used for the storage, transfer and processing of non-hazardous solid waste, located at 29831 Irish School Road in Dresden, Ontario.
Location details
Site address
29831 Irish School Road
Dresden,
ON
Canada
Site location map
The location pin reflects the approximate area where environmental activity is taking place.
View this location on a map opens link in a new windowProponent(s)
York1 Environmental Waste Solutions Ltd. as general partner for and on behalf of York1 Environmental Waste Solutions LP
5090 Commerce Boulevard
Suite 200
Mississauga,
ON
L4W 5M4
Canada
Proposal details
The subject property at 29831 Irish School Road in Dresden, Ontario is a 35-hectare property. The subject property has been used as an approved landfill and waste processing/transfer site. The site is owned and operated by York1 Environmental Waste Solutions Ltd.
The subject property holds existing Environmental Compliance Approval (ECA) No. A021304 for a 35-hectare waste disposal site with an 8-hectare landfilling area, and ECA No. A020401 for a 0.8-hectare waste processing site. The site currently services the Province of Ontario.
The application is for an amendment to the existing waste processing site ECA No. A020401 for a 0.8-hectare waste processing site to be used for the storage, transfer and processing of non-hazardous solid waste from industrial, commercial, institutional and municipal sectors. The proposed amendment to the waste processing facility is an increase in the area of the waste processing site to 25 hectares and to allow a maximum daily receiving rate of 6,000 tonnes per day of non-hazardous solid waste including construction and demolition waste and excess soil for beneficial reuse, and 1,000 tonnes per day of residual waste for final disposal on an annual average basis.
It is proposed the receiving rates at the waste processing facility include a maximum daily receiving rate cumulative of all materials received of 6,000 tonnes per day, broken down as follows:
- a maximum average residual waste limit of up to 1,000 tonnes per day of non-hazardous solid residual waste for final disposal at waste disposal landfills
- a maximum of up to 3,000 tonnes per day of non-hazardous solid waste materials including construction and demolition wastes that are processable into recycled materials, and
- a maximum of up to 3,000 tonnes per day of non-hazardous solid waste materials including soil and soil-like materials wastes that are processable into recycled materials.
It is proposed the maximum storage volumes at the waste processing facility be amended to:
- indoor storage of 1,800 tonnes of residual waste for transfer including source separated organics
- outdoor storage of 3,000 tonnes of recyclable materials such as wood, brick, block, concrete, asphalt, shingles, metals, and drywall, and
- outdoor storage of 30,000 tonnes of non-hazardous solid waste consisting of unprocessed and processed soil.
The proposed amendment is to allow operations at the waste processing site 24 hours per day and 7 days per week.
The proposed amendment to the waste processing facility also includes the following:
- construction of a new processing/sorting building capable of indoor storage of all incoming mixed solid non-hazardous waste with the associated leachate collection and storage system
- addition of the following waste classes for accepted and processed waste: sorted blue box materials, source-separated organics, asbestos-containing materials, tires, and soil, soil-like materials and excess soil for beneficial reuse
- installation of stationary equipment for processing construction and demolition waste into alternative low-carbon fuels (ALCF) in the new processing/sorting building
- placement of mobile diesel-powered shredding/grinding equipment for wood/construction & demolition waste outdoors
- installation of a soil treatment/soil washing system for processing solid and liquid soil to recover sand and aggregate material (optional)
- construction of a stormwater management infrastructure.
Supporting materials
View materials in person
Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.
Get in touch with the office listed below to find out if materials are available.
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Connect with us
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Comment
Commenting is now closed.
The comment period was from January 31, 2024
to March 16, 2024