October 6, 2023 - November 20, 2023 (45 days) Closed
Last updated
The application for an Environmental Compliance Approval with Limited Operational Flexibility from United Malwood Sawmills Inc., for their lumber products manufacturing and distribution facility located in Spencerville, Ontario was withdrawn by the Company. An approval was not issued.
The ministry has accepted the risk assessment prepared for the owner (Belmont Equity (58 York) Hamilton Inc.) for the property located at 58 York Boulevard, Hamilton, Ontario.
The director is considering issuing a Certificate of Property Use (CPU) in relation to the property.
December 20, 2023 - February 3, 2024 (45 days) Closed
Last updated
The Ministry has issued a new Environmental Compliance Approval to be issued to Loblaws Inc., for the establishment of sewage works, in support of a distribution Centre complete with a supermarket; for the collection, transmission, treatment and disposal of stormwater run-off from a site located at 1105 Fountain Street North, in Cambridge, Ontario.
February 29, 2024 - April 14, 2024 (45 days) Closed
Last updated
Certificate of Property Use No. 2023-CZSGP3 for 1319 Bloor Street West, Toronto was issued to KS 1319 Bloor Street West Holdings Inc., as part of their development plans for the site.
February 29, 2024 - April 14, 2024 (45 days) Closed
Last updated
Environmental Compliance Approval (sewage) number 3757-D5RKKW was issued to Melinda Joan Taylor for the replacement of an existing subsurface disposal works to service three existing buildings located at 15442 and 15428 Georgian Bay Shore, Township of Georgian Bay, District Municipality of Muskoka.
The proposal is for a new Environmental Compliance Approval for stormwater management works serving Toronto Hydro-Electric System Limited, located at 9 Canadian Road, in the City of Toronto.
Instrument type:
Changes to the site plan for a pit or quarry
ERO number
019-5584
Notice type
Instrument
Notice stage
ProposalUpdated
Proposal posted
Comment period
June 7, 2022 - July 7, 2022 (30 days) Closed
Last updated
The Warren Paving & Materials Group Limited, a subdivision of Lafarge Canada Inc. seeks to amend the site plan to deepen the final floor depth at Cannifton Quarry, in the Township of Thurlow.
The Director of Exploration has made a decision on the exploration permit application PR-24-000068 to IAMGOLD Corporation for early exploration activities.
The decision is to issue the mineral exploration permit.
The proposal is for a new Environmental Compliance Approval (sewage) for 1963948 Ontario Inc. for the approval of stormwater management works to serve a commercial and industrial manufacturing facility, located at 1003 Cameron Street in Hawkesbury, Ontario.
The proposal is for a new Environmental Compliance Approval for industrial stormwater management works serving Jane St. Nominee Inc., located at 11260 Jane Street, Toronto.
This proposal is for a new Environmental Compliance Approval (sewage) to be issued to Brimich Real Holdings Inc. for the establishment of stormwater management works as part of the proposed industrial logistics and warehouse facility, for the collection, and disposal of stormwater run-off from a site located at 635 Oak Park Road, Paris, Ontario.
This proposal is for a new Environmental Compliance Approval (sewage) to be issued to Ruscio Masonry and Construction Limited, for the establishment of sewage works, in support of a proposed Merrifield Townhome Condominium Lot Development located at 331 Patrick Street, in the City of Sault Ste. Marie, District of Algoma, Ontario.
The proposal is for a new Environmental Compliance Approval for industrial stormwater management works serving a Toronto Hydro Electric System Transformer Station located at 160 Morningside Avenue in the City of Toronto (morningside ms).
The proposal is for a new Environmental Compliance Approval for industrial stormwater management works serving a Toronto Hydro Electric System Transformer Station located at 37 Galloway Road in the City of Toronto.
The proposal is for a new Environmental Compliance Approval for industrial stormwater management works serving a Toronto Hydro Electric System Transformer Station located at 95 Kingsview Boulevard in the City of Toronto (blackfriar ms).
November 21, 2023 - December 21, 2023 (30 days) Closed
Last updated
Permit to Take Water No. P-300-1024448524 was issued to Dream Summit Industrial (Ontario) Inc. on May 17, 2024, to support the operation, maintenance and repair of the facility's cooling and water treatment systems, located at 7474 McLean Road East in Puslinch, Ontario.
Water will be taken from two wells in Puslinch, Ontario for 10 years.
Instrument type:
Acknowledging receipt of a closure plan for an advanced exploration project
ERO number
019-8598
Notice type
Instrument
Notice stage
ProposalUpdated
Proposal posted
Comment period
April 24, 2024 - May 24, 2024 (30 days) Closed
Last updated
Great Bear Resources Ltd. has submitted a Notice of Project Status to the Ministry of Mines (the “ministry”) and wishes to submit an Advanced Exploration Closure Plan for filing with the ministry. In anticipation of the potential submission, the proposed Closure Plan has been shared by the ministry for the purpose of seeking public comment.
Ontario is proposing to ease restrictions on offloading winter-grade gasoline from ships before the winter switchover date. We are also proposing clarifications about gasoline testing methods. This would reduce burden on industry and ensure consistency with national standards, while maintaining protection of human health and the environment.