September 18, 2018 - November 2, 2018 (45 days) Closed
Last updated
A new Environmental Compliance Approval (Sewage) was granted for an on-site stormwater management facility, in support of a proposed 19-storey mixed use building to be constructed at 192 Bronson Avenue, in the City of Ottawa, Ontario.
August 7, 2018 - September 21, 2018 (45 days) Closed
Last updated
Approval was granted to establish a stormwater management works structure servicing Collingwood Industrial Properties Inc., located at 1 and 5 Kirkhill Drive, in the Town of Bracebridge, District Municipality of Muskoka, Ontario.
October 12, 2018 - November 26, 2018 (45 days) Closed
Last updated
This is a decision to issue an Environmental Compliance Approval with Limited Operational Flexibility (Air) which replaces all the current Environmental Compliance Approvals for Air at this facility and includes the addition of new or historically unapproved sources for all emissions from Lush Manufacturing Ltd., located in Toronto.
October 12, 2018 - November 26, 2018 (45 days) Closed
Last updated
An Environmental Compliance Approval with Limited Operational Flexibility (Air) was issued which replaces all the current Environmental Compliance Approvals for Air at this facility and includes the addition of new or historically unapproved sources for all emissions from Lush Manufacturing Ltd., located in the City of Toronto.
A new Environmental Compliance Approval (Sewage) was granted to River Street Development Corporation, for the establishment of a stormwater management works structure.
An amended Environmental Compliance Approval was granted for existing subsurface disposal works for the collection, transmission, treatment and disposal of domestic sewage, having a total rated capacity of 43,625 L/day, serving the 1000 Islands/Mallorytown KOA Holiday Campground.
October 30, 2018 - December 14, 2018 (45 days) Closed
Last updated
A new Environmental Compliance Approval was granted for Patricia Jo Vanhorn and Reginald James Vanhorn operating as Watson's Camp (seasonal trailer park) for existing seasonal subsurface sewage disposal works.
October 15, 2018 - November 15, 2018 (31 days) Closed
Last updated
An Environmental Compliance Approval has been issued to 1260261 Ontario Inc., located in Chapleau, Ontario. The facility is a repair garage for logging equipment. This approval is for two (2) waste oil heaters, six (6) waste oil storage tanks, and welding operations.
October 1, 2018 - November 15, 2018 (45 days) Closed
Last updated
An Environmental Compliance Approval has been issued to 1260261 Ontario Inc., located in Chapleau, Ontario. The facility is a repair garage for logging equipment. This approval is for two (2) waste oil heaters, six (6) waste oil storage tanks, and welding operations.
September 26, 2018 - November 10, 2018 (45 days) Closed
Last updated
An amendment to the existing Environmental Compliance Approval (Waste Disposal Site) No. A620173 was issued for the use and operation of waste disposal site with a total area of 41.7 hectares for the processing of non-hazardous liquid waste.
September 25, 2018 - November 9, 2018 (45 days) Closed
Last updated
A new Environmental Compliance Approval was granted for the establishment of seasonal subsurface sewage disposal works rated at 45,325 L/day, to service a trailer park located at 4304 Champlain Road, in the City of Clarence-Rockland.
September 18, 2018 - November 2, 2018 (45 days) Closed
Last updated
This is an Environmental Compliance Approval (Air) for Olybro Inc., general partner of Olymel S.E.C. / L.P., a poultry processing facility, located in Brampton, Ontario.
July 24, 2018 - September 7, 2018 (45 days) Closed
Last updated
Approval granted to the proposed municipal and private stormwater management works serving Cor-Plan (2012) Inc, located at 1637 Hetherington Drive and 3789 Water Street, in the City of Peterborough.
Instrument type:
Direction to keep sewage works in repair
ERO number
019-0051
Notice type
Instrument
Notice stage
Exception
Exception posted
Last updated
The ministry issued emergency Director's direction to the company in order allow them to discharge treated effluent for a period beyond the seasonal window of April 1st to November 30th as required by their approval. A delay in issuing these instructions could result in harm to the environment.
On April 29, 2019, the Minister of Municipal Affairs and Housing filed a Zoning Order with the Registrar of Regulations as Ontario Regulation 76/19 to permit commercial and employment land uses on a property in the City of Vaughan. We want to inform you of this decision even though we are not required to under the Environmental Bill of Rights.
February 28, 2019 - March 30, 2019 (30 days) Closed
Last updated
This approval is to renew existing permit to take water No. 0712-7PDNLT for dead livestock processing (industrial) purposes (associated with gasification system and pollution control equipment). Permit No. 1843-BAPP8T was issued on March 28, 2019 for a period of 10 years.
October 22, 2018 - December 6, 2018 (45 days) Closed
Last updated
This new Environmental Compliance Approval (Industrial Sewage) is for Bry-ain Holdings Inc., for the establishment of stormwater management works consisting of grassed swales and infiltration trenches, discharging to Huntley Creek, to service a proposed office/repair garage development located at 2688 Carp Road in the City of Ottawa, Ontario.